Skip to content


SEPTEMBER SALE!! 20% OFF ONLINE PURCHASES - ADD DISCOUNT CODE "SEPT25" AT CHECKOUT


SEPTEMBER SALE!! 20% OFF ONLINE PURCHASES
ADD DISCOUNT CODE "SEPT25" AT CHECKOUT

WHSMS Plastering - Contents - ISO 45001

Introduction

This System begins at Part 4 as Parts 1-3 of all ISO Standards are Scope, Normative references, Terms and references (as defined in AS/NZS ISO 45001).

4. Context of the Organisation

a) General

5. Leadership and Worker Participation

a) General

b) WHS Policy

c) Organisational Roles, Responsibilities and Authorities

6. Planning

a) General

b) Hazard Identification and Assessment of Risks and Opportunities

c) COVID-19 Risk Management

d) Determination of Legal Requirements and Other Requirements

e) WHS Objectives and Planning to Achieve Them

7. Support

a) General

b) Resources

c) Competence

d) Awareness

e) Internal Communication

f) External Communication

g) Documented Information - General

h) Documented Information - Creating and Updating

i) Documented Information - Control of Documented Information

8. Operation

a) General

b) Eliminating Hazards and Reducing WHS Risks

c) Management of Change

d) Procurement

e) Emergency Preparedness and Response

9. Performance Evaluation

a) General

b) Monitoring, Measurement, Analysis and Performance Evaluation

c) Internal Audit

d) Management Review

10. Improvement

a) General

b) Incident and Injury Management Procedures

c) Incident and Injury Reporting

d) Incident and Injury Review

e) Workplace Violence and Bullying

f) Disciplinary Procedures and Counselling

g) Non Conformance and Corrective Action

11. Safe Work Method Statements (SWMS)

Work Process SWMS

  1. Boom Lift
  2. Ceiling Grid Installation
  3. Confined Spaces
  4. Cordless Power Tools
  5. Driving Vehicles
  6. Electricity and Power Tool Safety
  7. Elevated Work Platforms
  8. Hazardous Substances and Chemical Use
  9. Loading and Unloading Vehicles
  10. Manual Handling
  11. Plasterboard Works – Wall and Ceiling
  12. Scaffold – Fixed
  13. Scaffold – Mobile
  14. Steel Stud and Track Installation
  15. Working at Height
  16. Worksite Hazards

Tools SWMS

  1. Electric Drill
  2. Hand Tools
  3. Ladders
  4. Wet and Dry Vacuum