Skip to content
NATIONAL SAFE WORK MONTH SALE - 15% OFF ONLINE PURCHASES!
USE CODE "NSWM26" AT CHECKOUT.
NATIONAL SAFE WORK MONTH SALE
15% OFF ONLINE PURCHASES!
USE CODE "NSWM26" AT CHECKOUT.

Bathrooms WHS Management System & SWMS Pack Contents

Below is the complete document structure for our AS/NZS ISO 45001-aligned Bathrooms WHS Management System, bundled with a full pack of Safe Work Method Statements (SWMS). This page maps out every policy, procedure, register, checklist, form and SWMS included, organised by clause so you can see what's covered and quickly find what you need.

Supplied in fully editable Microsoft Word format, the system is built for bathroom construction and renovation businesses to implement without starting from scratch or hiring a consultant. Not every document will apply to every business — anything outside your operations can simply be removed from your system. Browse the sections below to explore the full contents.

1. Introduction

2. Context of the Organisation

a) General

3. Leadership and Worker Participation

a) General

b) WHS Policy

c) Organisational Roles, Responsibilities and Authorities

4. Planning

a) General

b) Hazard Identification and Assessment of Risks and Opportunities

c) Determination of Legal Requirements and Other Requirements

d) WHS Objectives and Planning to Achieve Them

5. Support

a) General

b) Resources

c) Competence

d) Awareness

e) Internal Communication

f) External Communication

g) Documented Information - General

h) Documented Information - Creating and Updating

i) Documented Information - Control of Documented Information

6. Operation

a) General

b) Eliminating Hazards and Reducing WHS Risks

c) Management of Change

d) Procurement

e) Emergency Preparedness and Response

7. Performance Evaluation

a) General

b) Monitoring, Measurement, Analysis and Performance Evaluation

c) Internal Audit

d) Management Review

8. Improvement

a) General

b) Incident and Injury Management Procedures

c) Incident and Injury Reporting

d) Incident and Injury Review

e) Workplace Violence and Bullying

f) Disciplinary Procedures and Counselling

g) Non Conformance and Corrective Action

9. Safe Work Method Statements (SWMS)

Work Process SWMS

  1. Asbestos - Working Around
  2. Cleaning - General
  3. Cordless Power Tools
  4. Demolition
  5. Door Installation
  6. Driving Vehicles
  7. Electricity and Power Tool Safety
  8. Floor Screeding
  9. Glazing – Windows, Glass Doors and Flyscreens
  10. Hazardous Substances and Chemical Use
  11. Hot Water System Installation
  12. Hot Works
  13. Joinery / Cabinet Making
  14. Loading and Unloading Vehicles
  15. Manual Handling
  16. Painting
  17. Plasterboard Works – Wall and Ceiling
  18. Plumbing Installation
  19. Respirable Crystalline Silica (RCS) Dust Control
  20. Skirtings and Architraves
  21. Suspended Waste Pipe Installation
  22. Tiling – Wall and Floor
  23. Wet Area Waterproofing

Tools SWMS

  1. Angle Grinder
  2. Arc Welder
  3. Explosive Power Tools
  4. Hand Tools
  5. Ladders
  6. Nail Gun
  7. Oxy Acetylene
  8. Wet and Dry Vacuum