Menu
Cart 0
SWMS Pack - Construction

SWMS Pack - Construction

  • $1,89000  +GST
  • Save $600


Construction Safe Work Method Statements Bundle

The following is a list of Safe Work Method Statements specific to Construction work that are available for instant download and use in your business. All SWMS Templates include the relevant step by step procedure, typical hazards and safety controls and are fully editable to suit your business needs.

All Occupational Safety Solutions SWMS templates contain generic pre-written procedures which are fully compliant with the Work Health and Safety (WHS) Act 2011WHS Regulations 2011 and relevant Codes of Practice.

If you require a Construction Safe Work Method Statements Pack containing different SWMS, one of our consultants can help create a discounted SWMS Pack specific to your business needs. Please contact us today to discuss how we may assist with our fully compliant Construction SWMS templates.

This Construction Safe Work Method Statements Bundle contains 99 SWMS’s.

60% OFF Construction SWMS when purchased as a bundle - Price: $2,490.00 + GST NOW 70% OFF! - $1,890.00 + GST

Construction Safe Work Method Statements include:

Work Process SWMS

  1. Air Conditioning Installation - Ducted
  2. Air Conditioning Installation - Split System
  3. Asbestos - Working Around
  4. Asbestos Removal
  5. Boom Lift
  6. Brick Cleaning
  7. Bricklaying
  8. Ceiling Grid Installation
  9. Cement Rendering
  10. Concrete Core Drilling
  11. Concrete Pumping
  12. Concreting
  13. Cordless Power Tools
  14. Crane - Mobile
  15. Deck and Pergola – Timber
  16. Demolition
  17. Door Installation
  18. Drainage Installation
  19. Driving Vehicles
  20. Dump Truck
  21. Earth Moving Equipment
  22. Electricity and Power Tool Safety
  23. Elevated Work Platforms
  24. Excavation or Trenching
  25. Excavator
  26. External Wall Cladding
  27. Fascias, Eaves and Guttering
  28. Fencing - Steel
  29. Fencing - Timber
  30. Fire Door Installation
  31. Floor Coverings
  32. Framework – Timber / Steel
  33. Gas Installation
  34. Glass Fence Installation
  35. Glazing – Windows, Glass Doors and Flyscreens
  36. Hazardous Substances and Chemical Use
  37. Hot Water System Installation
  38. Hot Works
  39. Insulation Installation
  40. Joinery / Cabinet Making
  41. Loading and Unloading Vehicles
  42. Manual Handling
  43. Mini Digger
  44. Painting
  45. Paving
  46. Pest Management - Termite - Pre-Construction
  47. Plasterboard Works – Wall and Ceiling
  48. Plumbing Installation
  49. Retaining Wall Construction
  50. Roof – Metal Sheeting
  51. Roof – Tiling
  52. Scaffold – Fixed
  53. Scaffold – Mobile
  54. Site Establishment
  55. Skid Steer Loader
  56. Skip Bins
  57. Skirtings and Architraves
  58. Skylight Installation
  59. Solar Panel Installation - Roof
  60. Stair Construction
  61. Steel Awning, Carport or Pergola
  62. Steel Stud and Track Installation
  63. Tiling – Wall and Floor
  64. Traffic Management
  65. Wardrobe Installation
  66. Wet Area Waterproofing
  67. Work in Ceiling Space
  68. Working at Height
  69. Worksite Hazards

Tools SWMS

  1. Angle Grinder
  2. Arc Welder
  3. Auger / Post Hole Digger
  4. Band Saw
  5. Brick Saw
  6. Chainsaw
  7. Chain Trencher
  8. Circular Saw – Portable
  9. Compressed Air
  10. Concrete Grinder
  11. Concrete Mixer – Portable
  12. Concrete Saw – Quick Cut
  13. Concrete Sealer Sprayer
  14. Disc Sander
  15. Drill Press
  16. Drop Saw
  17. Electric Drill
  18. Electric Plane
  19. Explosive Power Tools
  20. Fuel Powered Tool Safety
  21. Hand Tools
  22. High Pressure Water Cleaner
  23. Jack Hammer
  24. Ladders
  25. Nail Gun
  26. Panel Saw
  27. Plate Compactor
  28. Radial Arm Saw
  29. Slide Compound Saw
  30. Wet and Dry Vacuum

Features of the Construction Safe Work Method Statements bundle:

  • Ready-made documents – simply add your company details
  • Fully editable Microsoft Word format
  • Instant download
  • No subscriptions or ongoing fees!!

Occupational Safety Solutions Construction Safe Work Method Statements have been created to provide business owners with SWMS relevant to performing construction activities or using tools and equipment applicable to construction work.

Visit our Safe Work Method Statements page for for a full list of Safe Work Method Statements available for instant download.

Special Offers

Safety Management Plan
END OF FINANCIAL YEAR SALE!!

Take 20% OFF ALL online purchases!! Enter Discount Code "EOFY17" at the Checkout. Don't miss out!!

ENDS 30th JUNE 2017


SWMS Starter Pack  $285.00

25% OFF - Includes six (6) SWMS for use in your business today!

Click here to purchase your SWMS Starter Pack today!

Risk Management Forms Pack OVER 30% OFF - $150.00
Click here to purchase your Risk Management Forms Pack today!

User friendly Safety Training Database - $199.00
Click here to purchase your Safety Training Database today!

50% OFF Construction Site Safety Forms Pack - $199.00
Click here to purchase your Site Safety Forms Pack

50% OFF WHS System Starter Pack - $199.00
Click here to purchase your WHS System Starter Pack


We Also Recommend