Menu
Cart 0
SWMS Framework – Timber/Steel

SWMS Framework – Timber/Steel

  • $7250  +GST


This pre-written Framework – Timber or Steel Safe Work Method Statement template provides the typical safety controls and possible hazards associated with the installation of framework. This comprehensive Framework – Timber or Steel Safe Work Method Statement will form an essential part of your WHS system if you are responsible for this work activity. Simply add your company branding and this 17 page SWMS will be ready to use in your business today!

Framework – Timber or Steel Safe Work Method Statement covers:

  • PPE
  • Unstrapping frames
  • Lifting and fixing beams and joists
  • Listing and positioning frames
  • Electricity and power tool use
  • Using cordless power tools
  • Stand prefab or conventional frames and temporary brace to balance
  • Plumb and level frames and nailing off all intersections
  • Lifting and fixing first floor beams and joists
  • Lifting and carrying particle board sheet flooring
  • Gluing boards and nailing boards into position
  • Install perimeter fall protection at working platform
  • Install second row of floor sheeting
  • Erect ceiling joists
  • Erect ridge, principal, crown end and hip rafters
  • Lift and carry roof trusses or roofing into position
  • Plumb and level trusses and nailing off joining trusses

Framework – Timber or Steel Safe Work Method Statement includes:

  • Risk assessment guidelines and risk rating calculator
  • Step by step procedures
  • Possible hazards
  • Safety controls
  • Safety responsibilities
  • Personal Protective Equipment (PPE)
  • Plant and equipment
  • Legislation, regulations, codes and standards
  • Worker signoff

Framework – Timber or Steel Safe Work Method Statement features:

  • User friendly
  • Instant download
  • MS Word format allows easy customisation for task and site specific details
  • Customisation instruction provided

Framework – Timber or Steel Safe Work Method Statement References and Standards:

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011
  • SWA COP Managing Risks in Construction Work
  • SWA COP First Aid
  • SWA COP How to Prevent Falls at Workplaces
  • SWA COP Managing the Risk of Falls at Workplaces
  • SWA COP Hazardous Manual Tasks
  • SWA COP How to Manage Work Health and Safety Risks
  • SWA COP Managing the Work Environment and Facilities
  • AS 1576 – Scaffolding
  • AS 6001 – Working Platforms for Domestic Construction

Special Offers

Safety Management Plan
NOVEMBER 2017 SALE!!

10% OFF ALL online purchases!! Enter Discount Code "NOV17" at the Checkout. Don't miss out!!

ENDS 30TH NOVEMBER 2017


SWMS Starter Pack  $285.00

25% OFF - Includes six (6) SWMS for use in your business today!

Click here to purchase your SWMS Starter Pack today!

Risk Management Forms Pack OVER 30% OFF - $150.00
Click here to purchase your Risk Management Forms Pack today!

User friendly Safety Training Database - $199.00
Click here to purchase your Safety Training Database today!

50% OFF Construction Site Safety Forms Pack - $199.00
Click here to purchase your Site Safety Forms Pack

50% OFF WHS System Starter Pack - $199.00
Click here to purchase your WHS System Starter Pack


We Also Recommend