Menu
Cart 0
SWMS Solar Panel Installation - Roof

SWMS Solar Panel Installation - Roof

  • $7250  +GST


This pre-written Solar Panel Installation - Roof Safe Work Method Statement template provides the typical safety controls and possible hazards associated with the installation of solar panel systems on existing roofs. This comprehensive Solar Panel Installation - Roof SWMS template will form an essential part of your WHS system if you are responsible for this work activity. Simply add your company branding and this 13 page SWMS will be ready to use in your business today!

Solar Panel Installation - Roof Safe Work Method Statement covers:

  • Assess and prepare work areas
  • PPE
  • Working outside
  • Manual handling
  • Services / Utilities
  • Electricity and power tool use
  • Using cordless power tools
  • Using hand tools
  • Noisy equipment
  • Falls arrest systems on roofs
  • Cutting steel or aluminium frame members
  • Cutting tiles or roof sheeting
  • Installation of solar panels and associated components
  • Leaving the work area

Solar Panel Installation - Roof Safe Work Method Statement includes:

  • Risk assessment guidelines and risk rating calculator
  • Step by step procedures
  • Possible hazards
  • Safety controls
  • Safety responsibilities
  • Personal Protective Equipment (PPE)
  • Plant and equipment
  • Legislation, regulations, codes and standards
  • Worker signoff

Solar Panel Installation - Roof Safe Work Method Statement features:

  • User friendly
  • Instant download
  • MS Word format allows easy customisation for task and site specific details
  • Customisation instruction provided

Solar Panel Installation - Roof Safe Work Method Statement References and Standards:

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011
  • SWA COP Managing Risks in Construction Work
  • SWA COP First Aid
  • SWA COP How to Prevent Falls at Workplaces
  • SWA COP Hazardous Manual Tasks
  • SWA COP How to Manage Work Health and Safety Risks
  • SWA COP Managing Noise and Preventing Hearing Loss
  • SWA COP Managing the Work Environment and Facilities
  • SWA COP Managing Risks for Electrical Works
  • AS 6001 – Working Platforms for Domestic Construction

Special Offers

Safety Management Plan
END OF FINANCIAL YEAR SALE!!

Take 20% OFF ALL online purchases!! Enter Discount Code "EOFY17" at the Checkout. Don't miss out!!

ENDS 30th JUNE 2017


SWMS Starter Pack  $285.00

25% OFF - Includes six (6) SWMS for use in your business today!

Click here to purchase your SWMS Starter Pack today!

Risk Management Forms Pack OVER 30% OFF - $150.00
Click here to purchase your Risk Management Forms Pack today!

User friendly Safety Training Database - $199.00
Click here to purchase your Safety Training Database today!

50% OFF Construction Site Safety Forms Pack - $199.00
Click here to purchase your Site Safety Forms Pack

50% OFF WHS System Starter Pack - $199.00
Click here to purchase your WHS System Starter Pack


We Also Recommend