Menu
Cart 0
SWMS Pack - Construction

SWMS Pack - Construction

  • $1,89000  +GST
  • Save $600


Construction Safe Work Method Statements Bundle

The following is a list of Safe Work Method Statements specific to Construction work that are available for instant download and use in your business. All SWMS Templates include the relevant step by step procedure, typical hazards and safety controls and are fully editable to suit your business needs.

All Occupational Safety Solutions SWMS templates contain generic pre-written procedures which are fully compliant with the Work Health and Safety (WHS) Act 2011WHS Regulations 2017 and relevant Codes of Practice.

If you require a Construction Safe Work Method Statements Pack containing different SWMS, one of our consultants can help create a discounted SWMS Pack specific to your business needs. Please contact us today to discuss how we may assist with our fully compliant Construction SWMS templates.

This Construction Safe Work Method Statements Bundle contains 100 SWMS’s.

60% OFF Construction SWMS when purchased as a bundle - Price: $2,490.00 + GST NOW 70% OFF! - $1,890.00 + GST

Construction Safe Work Method Statements include:

Work Process SWMS

  1. Air Conditioning Installation - Ducted
  2. Air Conditioning Installation - Split System
  3. Asbestos - Working Around
  4. Asbestos Removal
  5. Boom Lift
  6. Brick Cleaning
  7. Bricklaying
  8. Ceiling Grid Installation
  9. Cement Rendering
  10. Concrete Core Drilling
  11. Concrete Pumping
  12. Concreting
  13. Cordless Power Tools
  14. COVID-19 (Working around others during COVID-19)
  15. Crane - Mobile
  16. Deck and Pergola – Timber
  17. Demolition
  18. Door Installation
  19. Drainage Installation
  20. Driving Vehicles
  21. Dump Truck
  22. Earth Moving Equipment
  23. Electricity and Power Tool Safety
  24. Elevated Work Platforms
  25. Excavation or Trenching
  26. Excavator
  27. External Wall Cladding
  28. Fascias, Eaves and Guttering
  29. Fencing - Steel
  30. Fencing - Timber
  31. Fire Door Installation
  32. Floor Coverings
  33. Framework – Timber / Steel
  34. Gas Installation
  35. Glass Fence Installation
  36. Glazing – Windows, Glass Doors and Flyscreens
  37. Hazardous Substances and Chemical Use
  38. Hot Water System Installation
  39. Hot Works
  40. Insulation Installation
  41. Joinery / Cabinet Making
  42. Loading and Unloading Vehicles
  43. Manual Handling
  44. Mini Digger
  45. Painting
  46. Paving
  47. Pest Management - Termite - Pre-Construction
  48. Plasterboard Works – Wall and Ceiling
  49. Plumbing Installation
  50. Retaining Wall Construction
  51. Roof – Metal Sheeting
  52. Roof – Tiling
  53. Scaffold – Fixed
  54. Scaffold – Mobile
  55. Site Establishment
  56. Skid Steer Loader
  57. Skip Bins
  58. Skirtings and Architraves
  59. Skylight Installation
  60. Solar Panel Installation - Roof
  61. Stair Construction
  62. Steel Awning, Carport or Pergola
  63. Steel Stud and Track Installation
  64. Tiling – Wall and Floor
  65. Traffic Management
  66. Wardrobe Installation
  67. Wet Area Waterproofing
  68. Work in Ceiling Space
  69. Working at Height
  70. Worksite Hazards

Tools SWMS

  1. Angle Grinder
  2. Arc Welder
  3. Auger / Post Hole Digger
  4. Band Saw
  5. Brick Saw
  6. Chainsaw
  7. Chain Trencher
  8. Circular Saw – Portable
  9. Compressed Air
  10. Concrete Grinder
  11. Concrete Mixer – Portable
  12. Concrete Saw – Quick Cut
  13. Concrete Sealer Sprayer
  14. Disc Sander
  15. Drill Press
  16. Drop Saw
  17. Electric Drill
  18. Electric Plane
  19. Explosive Power Tools
  20. Fuel Powered Tool Safety
  21. Hand Tools
  22. High Pressure Water Cleaner
  23. Jack Hammer
  24. Ladders
  25. Nail Gun
  26. Panel Saw
  27. Plate Compactor
  28. Radial Arm Saw
  29. Slide Compound Saw
  30. Wet and Dry Vacuum

Features of the Construction Safe Work Method Statements bundle:

  • Ready-made documents – simply add your company details
  • Fully editable Microsoft Word format
  • Instant download
  • No subscriptions or ongoing fees!!

Occupational Safety Solutions Construction Safe Work Method Statements have been created to provide business owners with SWMS relevant to performing construction activities or using tools and equipment applicable to construction work.

Visit our Safe Work Method Statements page for for a full list of Safe Work Method Statements available for instant download.

Special Offers

Safety Management Plan
MARCH 2021 SALE!!

Take 10% OFF all online purchases during March! Simply enter Discount Code "MAR21" at the Checkout to get 10% Off!! Don't miss out...

ENDS 31ST MARCH 2021


SWMS Starter Pack  $285.00

25% OFF - Includes six (6) of our most common SWMS for use in your business today!

Click here to purchase your SWMS Starter Pack today!

Risk Management Forms Pack 30% OFF - $195.00
Click here to purchase your Risk Management Forms Pack today!

User friendly Safety Training Database - $195.00
Click here to purchase your Safety Training Database today!

50% OFF Construction Site Safety Forms Pack - $195.00
Click here to purchase your Site Safety Forms Pack

50% OFF WHS System Starter Pack - $195.00
Click here to purchase your WHS System Starter Pack


We Also Recommend