
SWMS Stump Grinding
Original price
$69.95
-
Original price
$69.95
Original price
$69.95
$69.95
-
$69.95
Current price
$69.95
This pre-written Stump Grinding Safe Work Method Statement template provides the typical work steps, safety controls and possible hazards associated with carrying out stump grinding work.
This comprehensive Stump Grinding SWMS will form an essential part of your WHS Management System if your business is responsible for this work activity. Simply add your company details and this 12 page SWMS will be ready to use in your business today!
Stump Grinding Safe Work Method Statement covers:
- PPE
- Working outside
- Manual handling
- Noisy equipment
- Working near roads
- Preparation of work area
- Plant and equipment movement on site
- Loading and unloading stump grinder
- Inspecting stump
- Inspecting stump grinder
- Operating stump grinder
- Refuelling
- Turning off stump grinder
Stump Grinding Safe Work Method Statement includes:
- High Risk Construction Work (HRCW) selection table
- Risk assessment guidelines and risk rating calculator
- Step by step procedures
- Possible hazards
- Safety controls
- Safety responsibilities
- Personal Protective Equipment (PPE)
- Plant and equipment
- Legislation, regulations, codes and standards
- Worker signoff
Stump Grinding Safe Work Method Statement features:
- Instant download link sent to your email
- User friendly, fully editable Microsoft Word format
- Add your company details and use in your business today
- Will save you countless hours in research and development
- Free phone and email support if you need it
Stump Grinding Safe Work Method Statement References and Standards:
- Work Health and Safety Act
- Work Health and Safety Regulations
- COP First Aid in the Workplace
- COP Hazardous Manual Tasks
- COP How to Manage Work Health and Safety Risks
- COP Managing the Work Environment and Facilities
- COP Managing the Risks of Plant in the Workplace
- COP Managing Noise and Preventing Hearing Loss at Work
- AS 1742.3:2019 - Manual of Uniform Traffic Control Devices – Traffic Control for Works on Roads
COP = Code of Practice