SWMS Roof – Tiling – Occupational Safety Solutions
Menu
Cart 0
SWMS Roof – Tiling

SWMS Roof – Tiling

  • $7250  +GST


This pre-written Roof – Tiling Safe Work Method Statement template provides the typical work steps, safety controls and possible hazards associated with carrying out roof tiling work activities. This comprehensive Roof Tiling Safe Work Method Statement will form an essential part of your WHS system if you are responsible for these work activities. Simply add your company branding and this 17 page Roof Tiling SWMS will be ready to use in your business today!

Roof – Tiling Safe Work Method Statement covers:

  • PPE
  • Working outside
  • Manual handling
  • Delivery of materials + vehicle / plant movement on site
  • Exposure to Respirable Crystalline Silica (RCS) Dust
  • Electricity and power tool use
  • Using cordless power tools
  • Noisy equipment
  • Working at height
  • Use of scaffold
  • Setting up fall arrest system
  • Setting out the work
  • Lifting tiles
  • Walking on roof near edge
  • Attaching roof battens and sarking
  • Working near voids and in valleys
  • Moving materials on the roof
  • Setting up and moving a tile elevator
  • Loading and stacking tiles on roof
  • Mixing mortar with motorised cement mixer
  • Mixing mortar by hand
  • Cutting and laying tiles on the roof
  • Handling hazardous substances
  • Carrying mortar for bedding and pointing tiles
  • Use of flexible pointing material
  • Raising and lowering tools and equipment
  • Completion of work

Roof – Tiling Safe Work Method Statement includes:

  • Risk assessment guidelines and risk rating calculator
  • Step by step procedures
  • Possible hazards
  • Safety controls
  • Safety responsibilities
  • Personal Protective Equipment (PPE)
  • Plant and equipment
  • Legislation, regulations, codes and standards
  • Worker signoff

Roof – Tiling Safe Work Method Statement features:

  • User friendly
  • Instant download
  • MS Word format allows easy customisation for task and site specific details
  • Customisation instruction provided

Roof – Tiling Safe Work Method Statement References and Standards:

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2017
  • SWA COP Managing Risks in Construction Work
  • SWA COP First Aid
  • SWA COP How to Prevent Falls at Workplaces
  • SWA COP Managing the Risk of Falls at Workplaces
  • SWA COP Hazardous Manual Tasks
  • SWA COP How to Manage Work Health and Safety Risks
  • SWA COP Managing the Work Environment and Facilities
  • AS/NZS 4994.1 - Temporary Roof Edge Protection
  • AS/NZS 1576 – Scaffolding General requirements

Special Offers

Safety Management Plan
NOVEMBER 2019 SALE!!

10% OFF all online purchases during November!! Simply enter Discount Code "NOV19" at the Checkout to get 10% Off. Don't miss out!!

ENDS 30TH NOVEMBER 2019


SWMS Starter Pack  $285.00

25% OFF - Includes six (6) of our most common SWMS for use in your business today!

Click here to purchase your SWMS Starter Pack today!

Risk Management Forms Pack 30% OFF - $195.00
Click here to purchase your Risk Management Forms Pack today!

User friendly Safety Training Database - $195.00
Click here to purchase your Safety Training Database today!

50% OFF Construction Site Safety Forms Pack - $195.00
Click here to purchase your Site Safety Forms Pack

50% OFF WHS System Starter Pack - $195.00
Click here to purchase your WHS System Starter Pack


We Also Recommend