Skip to content
EOFY SPECIAL! 25% OFF ONLINE PURCHASES - ADD DISCOUNT CODE "EOFY25" AT CHECKOUT
EOFY SPECIAL! 25% OFF ONLINE PURCHASES
ADD DISCOUNT CODE "EOFY25" AT CHECKOUT

SWMS Front End Loader

Original price $79.75 - Original price $79.75
Original price
$79.75
$79.75 - $79.75
Current price $79.75

This pre-written Front End Loader Safe Work Method Statement template provides the typical work steps, safety controls and possible hazards associated with operating and maintaining a front end loader on your worksites.

This comprehensive Front End Loader SWMS will form an essential part of your Safety Management System if your business is responsible for this machinery. Simply add your company details and this 12 page SWMS will be ready to use in your business today!

Front End Loader Safe Work Method Statement covers:

  • PPE
  • Checking work area
  • Services / Utilities
  • Working outside
  • Working near roads
  • Loading and unloading Front End Loader
  • Front End Loader checks and maintenance
  • Entering and exiting the Front End Loader
  • Operating Front End Loader
  • Refuelling
  • Completion of work or shift

Front End Loader Safe Work Method Statement includes:

  • High Risk Construction Work (HRCW) selection table
  • Risk assessment guidelines and risk rating calculator
  • Step by step procedures
  • Possible hazards
  • Safety controls
  • Safety responsibilities
  • Personal Protective Equipment (PPE)
  • Plant and equipment
  • Legislation, regulations, codes and standards
  • Worker signoff

Front End Loader Safe Work Method Statement features:

  • Instant download link sent to your email
  • User friendly, fully editable Microsoft Word format
  • Step by step procedures for adding Company details and variable "site specific" information available on our Frequently Asked Questions (FAQ) webpage.
  • Free phone and email support for all our templates

        Front End Loader Safe Work Method Statement References and Standards:

        • Work Health and Safety Act 2011
        • Work Health and Safety Regulations 2017
        • SWA COP First Aid in the Workplace
        • SWA COP How to Manage Work Health and Safety Risks
        • SWA COP Hazardous Manual Tasks
        • SWA COP Managing Noise and Preventing Hearing Loss at Work
        • SWA COP Excavation Work
        • SWA COP Managing the Risks of Plant in the Workplace
        • AS 1742.3:2019 - Manual of Uniform Traffic Control Devices – Traffic Control for Works on Roads
        • AS 5327:2022 – Earth-moving Machinery - Access Systems