Menu
Cart 0
SWMS Energise and Commission Electrical Installation

SWMS Energise and Commission Electrical Installation

  • $7250  +GST


This pre-written Energise and Commission Electrical Installation Safe Work Method Statement template provides the typical safety controls and possible hazards associated with energising and commissioning an electrical installation. This comprehensive Energise and Commission Electrical Installation SWMS will form an essential part of your WHS system if you are responsible for this work activity. Simply add your company branding and this 10 page SWMS will be ready to use in your business today!

Energise and Commission Electrical Installation Safe Work Method Statement covers:

  • PPE
  • Manual handling
  • Planning the work and work area
  • Inspect electrical test equipment
  • Isolate, lockout and tag
  • Test for de-energised
  • Check electrical work carried out
  • Test electrical works carried out
  • Energise the cabling and test
  • Handover
  • Completion of work

Energise and Commission Electrical Installation Safe Work Method Statement includes:

  • Risk assessment guidelines and risk rating calculator
  • Step by step procedures
  • Possible hazards
  • Safety controls
  • Safety responsibilities
  • Personal Protective Equipment (PPE)
  • Plant and equipment
  • Legislation, regulations, codes and standards
  • Worker signoff

Energise and Commission Electrical Installation Safe Work Method Statement features:

  • User friendly
  • Instant download
  • MS Word format allows easy customisation for task and site specific details
  • Customisation instruction provided

Energise and Commission Electrical Installation Safe Work Method Statement References and Standards:

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2017
  • SWA COP Construction Work
  • SWA COP First Aid in the Workplace
  • SWA COP Hazardous Manual Tasks
  • SWA COP How to Manage Work Health and Safety Risks
  • SWA COP Managing the Work Environment and Facilities
  • SWA COP Managing Noise and Preventing Hearing Loss at Work
  • SWA COP Managing Electrical Risks in the Workplace
  • AS/NZS 3000:2018 Electrical Installations
  • AS/NZS 3017:2007 Electrical Installations – Verification Guidelines

Special Offers

Safety Management Plan
MAY SALE!!

10% OFF all online purchases during May!! Simply enter Discount Code "MAY22" at the Checkout to get 10% Off!! Don't miss out...

ENDS 31ST MAY 2022

SWMS Starter Pack  $285.00

25% OFF - Includes our six (6) most common SWMS used in construction businesses.

Click here to purchase your SWMS Starter Pack today!

50% OFF WHS System Starter Pack - $195.00
Click here to purchase your WHS System Starter Pack

Click here to view other Special Offers


We Also Recommend