Skip to content
PROUDLY SUPPORTING AUSTRALIAN BUSINESSES SINCE 2010!
CALL 1800 304 336 TODAY FOR FREE ADVICE - ALL TEMPLATES 2024 COMPLIANT.
SUPPORTING AUSSIE BUSINESSES SINCE 2010!
CALL 1800 304 336 TODAY FOR FREE ADVICE.

SWMS Electrical Outlet Installation

Original price $79.75 - Original price $79.75
Original price
$79.75
$79.75 - $79.75
Current price $79.75

This pre-written Electrical Outlet Installation Safe Work Method Statement template provides the typical safety controls and possible hazards associated with installing electrical outlets. This comprehensive Electrical Outlet Installation SWMS will form an essential part of your Safety Management System if you are responsible for this work activity. Simply add your company branding and this 11 page SWMS will be ready to use in your business today!

Electrical Outlet Installation Safe Work Method Statement covers:

  • PPE
  • Manual handling
  • Inspect electrical test equipment
  • Planning the work and work area
  • Electricity and power tool use
  • Using cordless power tools
  • Isolate, lockout and tag
  • Test for de-energised
  • Fit mounting brackets and run cables
  • Connect new outlets
  • Completion of work

Electrical Outlet Installation Safe Work Method Statement includes:

  • Risk assessment guidelines and risk rating calculator
  • Step by step procedures
  • Possible hazards
  • Safety controls
  • Safety responsibilities
  • Personal Protective Equipment (PPE)
  • Plant and equipment
  • Legislation, regulations, codes and standards
  • Worker signoff

Electrical Outlet Installation Safe Work Method Statement features:

  • User friendly
  • Instant download
  • Fully editable Microsoft Word format allows easy customisation
  • Step by step procedure showing how to add your Company details:
  • Step by step procedure showing how to add "site specific" information Click Here

    Electrical Outlet Installation Safe Work Method Statement References and Standards:

    • Work Health and Safety Act 2011
    • Work Health and Safety Regulations 2017
    • SWA COP Construction Work
    • SWA COP First Aid in the Workplace
    • SWA COP Hazardous Manual Tasks
    • SWA COP How to Manage Work Health and Safety Risks
    • SWA COP Managing the Work Environment and Facilities
    • SWA COP Managing Noise and Preventing Hearing Loss at Work
    • SWA COP Managing Electrical Risks in the Workplace
    • AS/NZS 3000:2018 Electrical Installations