Skip to content


NATIONAL SAFE WORK MONTH SALE!! 15% OFF ONLINE PURCHASES
ADD DISCOUNT CODE "NSWM25" AT CHECKOUT


NATIONAL SAFE WORK MONTH SALE!!
15% OFF ONLINE PURCHASES
ADD DISCOUNT CODE "NSWM25" AT CHECKOUT

SWMS Pack - Roadwork

Original price $940.00 - Original price $940.00
Original price
$940.00
$940.00 - $940.00
Current price $940.00

Roadwork Safe Work Method Statements Pack

This Roadwork SWMS Pack has been developed to provide Roadwork businesses with a set of pre-written and compliant SWMS that are available for instant download and use in your business. All Roadwork SWMS templates are provided in fully editable Microsoft Word format and include the relevant step by step procedures, typical hazards, safety controls, responsibilities, risk matrix, PPE etc.

All Occupational Safety Solutions SWMS templates contain pre-written procedures which are compliant with the Model Work Health and Safety (WHS) Act, Model WHS Regulations, relevant Model Codes of Practice and Australian Standards.

If you don't need all the SWMS in this Roadwork Safe Work Method Statements Pack, let us know which SWMS you require and we can provide a quote for a discounted tailored SWMS Pack. Download the Roadwork SWMS Selection List here and email us for a free quote. We can offer a SWMS Pack discount based on the number of SWMS purchased. Alternatively Contact Us via phone or email to discuss your specific needs.

This Roadwork Safe Work Method Statements Pack contains 43 SWMS’s.

65% OFF Roadwork SWMS when purchased as a bundle (discount compared to individual SWMS pricing).

Roadwork Safe Work Method Statements Pack includes:

Work Process SWMS

  1. Articulated Hauler
  2. Asphalt Paving Machine
  3. Backhoe
  4. Concrete Core Drilling
  5. Concrete Pumping
  6. Concreting
  7. Cordless Power Tools
  8. Dozer
  9. Driving Vehicles
  10. Dump Truck
  11. Earth Moving Equipment
  12. Electricity and Power Tool Safety
  13. Excavation or Trenching
  14. Excavator
  15. Front End Loader
  16. Grader
  17. Hazardous Substances and Chemical Use
  18. Labourer - General
  19. Loading and Unloading Vehicles
  20. Manual Handling
  21. Pipelayer Machine
  22. Prime Mover
  23. Respirable Crystalline Silica (RCS) Dust Control
  24. Roller Compaction
  25. Site Establishment
  26. Skid Steer Loader
  27. Stormwater Drainage Installation
  28. Traffic Management
  29. Water Truck
  30. Worksite Hazards

Tools SWMS

  1. Auger / Post Hole Digger
  2. Chain Trencher
  3. Compressed Air
  4. Concrete Mixer - Portable
  5. Concrete Saw - Quick Cut
  6. Explosive Power Tools
  7. Fuel Powered Tool Safety
  8. Generator
  9. Hand Tools
  10. High Pressure Water Cleaner
  11. Jack Hammer
  12. Plate Compactor
  13. Water Pump - Petrol

Features of the Roadwork Safe Work Method Statements Pack:

  • Instant download link sent to your email
  • Pre-written SWMS – simply add your company details
  • User friendly, fully editable Microsoft Word format
  • All products backed by FREE phone and email support!
  • No subscriptions or ongoing fees!!

Purchasing this Roadwork SWMS Pack will save countless hours in research and development, assist with managing the hazards associated with your work, keep your team safe and potentially unlock new opportunities for your business.

Occupational Safety Solutions Roadwork Safe Work Method Statements have been created to provide business owners with SWMS relevant to performing roadwork activities or using tools and equipment applicable to roadwork.

Visit our Safe Work Method Statements page for for a full list of Safe Work Method Statements available for instant download.